The Tuesday Night Club Official Web Site

The Tuesday Night Club on Tour

Index

Tour 2005

Index

1 - The Western half of the Witham Navigable Drains - Newham Drain, Castle Drain, West Fen Drain, Houghbridge Drain, Sandy Bank Drain and the Twenty Foot Drain.

HINTS AND TIPS

Navigation Authority for the Witham Navigable Drains (apart from the EA administered ones listed)
Witham Fourth District Internal Drainage Board
47 Norfolk Street
BOSTON
PE21 6PP
Tel: 01205 310099
Fax: 01205 311282
drainage@w4idb.co.uk

http://www.w4idb.co.uk/

Navigation Authority for the following Witham Navigable Drains:
Stonebridge, Maud Foster and Catchwater Drains:
Environment Agency Anglia Region, Kingfisher House, Goldhay Way, Orton Goldhay, Peterborough PE2 5ZR: Telephone 01733 371811 : Fax 01733 231840 :

Anton’s Gowt Lock
72ft x 14ft

Cowbridge Lock
70ft x 9ft


The Witham Navigable Drains are navigable from April to October. During the winter the levels may be lower and boats may not be able to exit over the lower cill of Anton’s Gowt Lock. A 70ft narrow boat would be able to turn on all the corners we encountered, except the junctions at the ends of Sandy Sank Drain.
It is best to contact the Witham Fourth District Internal Drainage Board before entering the drains to find out if there are any stoppages or restrictions.

We had twice tinkered with the thought of doing the Witham Navigable Drains, but neither of these attempts had been serious, as we had been constrained by time. Come the 2005 TNC cruising season, the Witham Navigable Drains had become one of our last ‘great-uncharted areas’ of the connected English waterway system, so we decided this was to be the focus of our 2005 Tour.
The Witham Fourth Internal Drainage Board was contacted and they reported back that there were no stoppages and that the low accommodation bridge on the West Fen Main Drain near where Newham Drain intersects had been rebuilt with 2.5 metres navigable headroom. This bridge had proved a problem on a previous visit, but at the time we knew it was due for replacement, having been damaged by a “car in the drain” incident.
As with all passages on drainage systems that tolerate or have a right of navigation, the state of the drains is on a “how you find it” basis. A drain that is impassable on one trip may have been grubbed out by an excavator on the next. The only “Navigation guide” we know of is a photocopied sheet showing the bridge heights and winding points available from the local IWA Branch. We had a trusty, well-worn version, dating from the mid 1990’s.
The period for the trip was set for around a week in mid July. This time there were to be no pressing navigational issues, like a Wash passage, to curtail our exploits! Crew for this part of the Tour was just three - Neil, Martin Clark and Peter Wright. There was to be no back up narrowboat, but, on the other hand, we had plenty of time to overcome any navigational difficulties encountered.
Although we had the inflatable tender with Honda 2HP outboard on board Earnest, we intended not to revert to its’ use unless the weed became too bad, which restricted our trip to air-draught constraints. This meant that any bridges with less than 5ft 3ins headroom would limit our passage. 

19th July 2005

The only navigable entrance to the Witham Navigable Drains is via the British Waterways controlled lock at Anton’s Gowt. This is a couple of miles from the tidal limit of the River Witham at Boston Grand Sluice. We arrived in the early afternoon, following a passage down from Saxilby on the Fossdyke, via Lincoln. As we needed something to eat and wanted an early start the next day, we decided to push on to Boston, moor on the visitor moorings for the evening, and slip back to Anton’s Gowt in the half-light for a quite night.
Boston was surprisingly busy, with a couple of barges taking up a lot of space. The venue that night was yet another Wetherspoons, The Moon Under Water (we seemed to have navigated the system via Wetherspoons again this year!) It was a nice quite passage back to the still empty visitor moorings at Anton’s Gowt. In the fading light of a fine sunset we moored up and then took a wander round the lock to check all was well.

20th July 2005

The next day started with a brilliant sunny morning, so at 06:30 we were off down Anton’s Gowt lock onto the Drains. The main level of the Witham Navigable Drains is around five foot below the summer level of the River Witham. To cope with flood levels in the River Witham the top gates are massively tall affairs. The only method of boarding the boat below the lock was a rather rickety ladder attached to the left hand wing wall.
Below the lock there is a T junction with the welcoming Malcolm Arms pub opposite. To the right, the Frith Bank Drain takes the direct navigable route to Cowbridge and hence the backside of Boston. We turned left along Newham Drain. Neil took off the cratch cover and cratch board and got out "Big Bertha", the 14ft shaft. Another junction, Castle Dyke, soon came to the left.
We did not hold out much hope here as on our previous passage we had found a new, second low pipe on Sharpes Bridge, the first bridge encountered. We reversed up, not without difficulty, and got stuck by the second pipe, 5ft 2ins above the water level. After extracting the boat we continued along Newham Drain, part of a through circular route without low bridges, which we had traversed on a previous visit.
We were surprised to grind to a halt half way along this section of Newham Drain by the B1184 Canister Hall Bridge. Next followed the arduous task of 4 hours of bow hauling and poling the boat to the cross junction with the West Fen Main Drain. Here we turned left, bound for Bunkers Hill and beyond.
The West Fen Drain was deeper and weed free, with an easy passage under the new higher farm accommodation bridge (the older, lower bridge had stopped us last time we were here). Just before Bunkers Hill "Tunnel", a long round concrete tube bridge, there was an unexpected weed boom. Peter Wright was dropped off to deal with it and started reassembly once we were through the "tight" tunnel.
A rare TNC lunch stop ensued beyond the bridge, as the Olde Onion pub by the bridge looked so welcoming. We now carried on up West Fen Main Drain to the junction on the right with the narrow, but weed free, Sandy Bank Drain (this was to be our exit route). At this point, the Main West Fen Drain is also known as Houghbridge Drain, named after Hough Bridge, which takes the main B1192 road over the drain and though New York.
The modern flat deck Hough Bridge was quite low and the warning tyre fender over Earnest’ front mushroom vent scraped under the bridge deck. Beyond here passage was still easy and we thought it was to be the same up to the top junction with Castle Dyke (there are other low bridges at this end of Castle Dyke).
Things changed dramatically at the site of a removed weed boom, and it was a struggle up to the junction involving some poling and just the use of two shafts to wind. Back down Houghbridge Drain we did the predictable stop at Hough Bridge to walk into downtown New York, not such an impressive town as its American namesake!
By 17:30 we were back to the junction with Sandy Bank Drain and proceeded up this narrow drain. Half way along this mile-and-a-half-cut across to the top section of Newham Drain, the drain became even narrower. However, it was not too shallow, nor packed in the lower "depths" with the dreaded blanket weed.
The blanket weed on the drains is of a special variety. Once you start to pull it up from the drain floor it manages to "anchor" the prop and skeg of the boat to the bottom. The only way free is to pole and/or bow haul, whilst another crew member cuts the propeller / skeg / rudder free from the morass found in the depths of the weed hatch. It is pointless trying to pull the weed out of the weed hatch, as that procedure could go on forever. Perhaps, when sinful narrowboaters die, they experience this for infinity!..........anyway I digress. After exiting Sandy Dank Drain and proceeding down Newham Drain the anticipated weed problems started (we have had trouble here before) so we ended up poling from stern and bow through the narrow section below Mills Bridge.
Beyond the next three bridges we managed to get going again in tickover, before having to resort to poling again through the three-bridge Dovecote Hall Farm section. After this it was power on tick over to the cross junction with the Main West Fen Drain.
The final "bridge" is another modern corrugated steel tunnel. This one is tighter than Bunkers Hill, with a rather sharp turn after. It was now plain sailing down the deep and increasingly wide West Fen Main Drain, which is the exit channel for this end of the Witham Navigable Drains.
It was the start of a beautiful sunset when we came to the junction with the Twenty Foot Drain, a north spur off the West Fen Drain, so we decided to try to reverse a short section up this narrow drain in order to stop there for the night. This drain supposedly had a 3ft 7ins air draught bridge, not far after the junction bridge.
The junction bridge was difficult to line up (especially in reverse!) as it has concrete wash walls that curve into the channel. Once through and into the main channel, we soon found that this was going to be easy. There was the tell-tale signs of fresh mud on one bank as this drain had just been grubbed out by an excavator!
We really did fly up this tiny drain. By trailing the two shafts, hardly any course corrections were needed with the bow thruster, which could be used since there was no weed.
The first "low" bridge soon loomed ahead (or should that be astern?). It was a recent corrugated steel tube bridge and looked just navigable. Earnest was a perfect fit and we slid through without touching the handrails. It was still plain sailing to just above the next bridge (Westville Farm Bridge). Here the drain was stanked off, with lowered water levels, as the drain men were still dredging this next section.
Beyond the excavators the stodgy morass showed that boats could not have been up this drain for years. We had a welcoming committee at the bridge, as a friendly farmer and his sons came out of their house to take pictures and wish us well. We were invited to tie up for the night, just above the bridge. The farmer told us that having talked to the drain men, it would soon be possible to wind at the end, some quarter of a mile further, as another drain comes in from the west.
So we tied up at 21:50. Not wishing to get off the boat we simply pushed the long shaft into the clay bottom of the drain as an anchor and tied the stern rope to it. Neil was soon getting stuck into spag. bol. construction. It was one of those magical evenings - a deathly silent spot (apart from the squeaking of owls), magnificent sunset, a fine wine and meal and the fitting end to an exhausting day.

Pict1422.jpg (152874 bytes)
Peaceful overnight moorings on the River Witham at Anton's Gowt, by the entrance lock down to the Drains.

Pict1424.jpg (147491 bytes)
Anton's Gowt Lock. This is maintained by British Waterways.

Pict1426.jpg (138096 bytes)
Anton's Gowt Lock.

Dscn1832.jpg (33483 bytes)
Turning left from Anton's Gowt Lock along Newham Drain. Mere Booth Road Bridge.

Pict1428.jpg (122317 bytes)
Mere Booth Road Bridge. Newham Drain.

Pict1430.jpg (91442 bytes)
Looking back at Mere Booth Road Bridge. Newham Drain.

Pict1431.jpg (135058 bytes)
Newham Drain.

Pict1432.jpg (83504 bytes)
Castle Dyke to left, Newham Drain carries on to the right.

Pict1434.jpg (117477 bytes)
Weed problems down Castle Dyke.

Dscn1834.jpg (21851 bytes)
Air draught problems at Sharp's Bridge down Castle Dyke.

Pict1435.jpg (93172 bytes)
Back on Newham Dyke, Canister Hall Bridge in the distance.

Pict1436.jpg (103462 bytes)
Looking back down Newham Dyke.

Pict1439.jpg (134363 bytes)
Newham Dyke bow hauling and poling, due to blanket weed.

Newhdrn1.jpg (17457 bytes)
The dreaded Newham Dyke blanket weed!

Pict1440.jpg (126715 bytes)
We are just turning left up West Fen Drain, at the crossroads with Newham Drain and West Fen Drain.

Pict1441.jpg (152954 bytes)
Looking back, West Fen Drain to left, Newham Drain to right.

Pict1442.jpg (136775 bytes)
Looking back down West Fen Drain.

Pict1443.jpg (135504 bytes)
The new high air draught farm accommodation bridge. West Fen Drain.

Dscn1841.jpg (40865 bytes)
The old, damaged low farm accommodation bridge. West Fen Drain.( 2001)

Pict1484.jpg (204530 bytes)
Peter Wright tackles the weed boom below Bunker's Hill. West Fen Drain.

Pict1446.jpg (124555 bytes)
Looking back at Peter Wright re-assembling the weed boom. West Fen Drain.

Pict1447.jpg (110645 bytes)
Bunker's Hill "Tunnel". West Fen Drain.

Pict1448.jpg (135491 bytes)
Bunker's Hill "Tunnel". West Fen Drain.

Pict1450.jpg (90836 bytes)
NB Earnest in Bunker's Hill "Tunnel". West Fen Drain.

Pict1452.jpg (155258 bytes)
Looking back at Bunker's Hill "Tunnel". West Fen Drain.

Pict1453.jpg (193018 bytes)
The Old Onion Inn at Bunker's Hill.


Signpost at Bunker's Hill.

Pict1456.jpg (129960 bytes)
Looking back at Bunker's Hill "Tunnel". West Fen Drain.

Pict1457.jpg (129727 bytes)
Looking up Sandy Bank Drain. West Fen Drain.

Pict1459.jpg (115866 bytes)
Hough  Bridge, West Fen Drain. At this point onwards West Fen Drain is also known as Houghbridge Drain.

Pict1461.jpg (101121 bytes)
The low Hough Bridge. Houghbridge Drain.

Pict1467.jpg (37145 bytes)
The village of New York is a few hundred yards north from Hough Bridge.

Pict1469.jpg (163493 bytes)
Moored under Hough Bridge. Houghbridge Drain.

Pict1473.jpg (97144 bytes)
Looking back down West Fen Drain from Hough  Bridge.

Pict1464.jpg (134881 bytes)
Houghbridge Drain, approaching Bettinson's Bridge and the top junction with Castle Dyke.

Pict1474.jpg (102274 bytes)
Back at the junction with Sandy Bank Drain we turn left down Sandy Bank Drain.

Pict1475.jpg (99278 bytes)
Sandy Bank Drain.

Newhdrn4.jpg (13114 bytes)
Sandy Bank Drain.

Newhdrn3.jpg (12946 bytes)
The junction with Sandy Bank Drain and the top of Newham Drain.

010703-050.jpg (77674 bytes)
Dovecote Hall Farm Bridge. Newham Drain.

Dscn1843.jpg (18991 bytes)
Newham Drain.

Pict1489.jpg (148943 bytes)
Back to West Fen Drain and the corrugated steel Westville Road "Tunnel" Newham Drain.

Pict1492.jpg (154995 bytes)
Westville Road "Tunnel" Newham Drain.

Pict1495.jpg (128612 bytes)
Westville Road "Tunnel" Newham Drain.

Pict1498.jpg (130078 bytes)
Carrying on towards Boston on the lower section of West Fen Drain.

Pict1499.jpg (121841 bytes)
Thacker's Road Bridge. West Fen Drain.

Pict1501.jpg (94191 bytes)
We have turned left off West Fen Drain, to go up the Twenty Foot Drain astern. Westville Farm Bridge, this has recently been raised using a corrugated steel tube bridge.

Pict1503.jpg (108642 bytes)
The end at that moment, just above Hardy's / Beeches Lane Bridge. Twenty Foot Drain.

Pict1507.jpg (102179 bytes)
The Witham Fourth Internal Drainage Board men grubbing out the Twenty Foot Drain above Barker's yard.

The Tour Continues...


Home Page | "Earnest" | "Beatty" | Canal Restoration